Addition to the church

We are in the process of making some changes to our church.  We want to be able to serve our senior members as well as any new members that may need these facilities.  We are adding a handicap accessible restroom as well as a larger vestibule on the front.

The sanctuary will be closed for several months while the addition is taking place.  Our worship services and bible studies on Wednesday evenings will be in the Fellowship Hall.

The following is a list of things that will help everyone during this time.

  • Those coming from the church basement for worship are asked to use the walks (not the grass) and come through the double doors of the fellowship hall for service.  This will help to keep our floor a little cleaner.

  • We ask that you fill up the front chairs first and leave the back for late comers.

  • Greeters/deacons are asked to take name, address, and phone of any visitors.

  • Restrict coming in and going out to a minimum during worship services to cut down on the distractions.

  • Please do not leave any items in the chairs after our services.  This will help with the upkeep.

  • Pray daily for the construction to go smoothly, safe, and completion on time.  Pray for the workers.

Below are photos so you can keep track of how we are progressing.  I will attempt to add new pictures each week.  You can select a picture to get a larger view.

Before work was started. 08-17-02

08-17-1.jpg (33412 bytes) 08-17-2.jpg (39532 bytes) 08-17-3.jpg (35546 bytes) 08-17-4.jpg (28110 bytes)

Work was finally started after getting all of the permits.  You will notice that the columns have been removed, and supports installed.  Here is the end of the first week. - 10-05-02

10-05-1.jpg (32390 bytes) 10-05-2.jpg (35990 bytes) 10-05-3.jpg (37464 bytes) 10-05-4.jpg (33634 bytes)

The old porch is gone.  Waiting for the ground to dry enough for the footers. - 10-19-02

10-19-1.jpg (35556 bytes) 10-19-2.jpg (41925 bytes) 10-19-3.jpg (37807 bytes) 10-19-4.jpg (33431 bytes)

The rain has finally stopped (although we have needed it). Footers have been poured.  Waiting on the block and brick - 11-02-02

11-02-1.jpg (36444 bytes) 11-02-2.jpg (38233 bytes) 11-02-3.jpg (43651 bytes) 11-02-4.jpg (35671 bytes) 11-02-5.jpg (45578 bytes) 11-02-6.jpg (52800 bytes)

The block and brick have been done. Next thing to do is to pour the floor. - 11-24-02

11-24-1.jpg (37240 bytes) 11-24-2.jpg (39721 bytes) 11-24-3.jpg (40775 bytes) 11-24-4.jpg (38321 bytes) 11-24-5.jpg (41240 bytes) 11-24-6.jpg (40024 bytes)

Floor has been poured and the the walls are starting to go up.  Notice that the vinyl siding was removed to be used later.  We had a snow during this week, so work was only able to be done on Monday and Tuesday. - 12-08-02

12-08-1.jpg (37232 bytes) 12-08-2.jpg (42172 bytes) 12-08-3.jpg (37145 bytes) 12-08-4.jpg (32736 bytes)

The new roofline has been built.  And you can also see some of the internal walls as well. - 12-21-02

12-21-1.jpg (42298 bytes) 12-21-2.jpg (44951 bytes) 12-21-3.jpg (40674 bytes) 12-21-4.jpg (42481 bytes) 12-21-6.jpg (48754 bytes) 12-21-7.jpg (39422 bytes)

The brickwork has finally started. (Yoo Hoo)  The roof has been shingled, the front boarded, and the new columns in place. - 01-12-03

01-12-1.jpg (38694 bytes) 01-12-2.jpg (42657 bytes) 01-12-3.jpg (37211 bytes) 01-12-4.jpg (40564 bytes)

A lot of work has taken place over the last couple of months.  Most of it has been inside.  We hope to be back in the church within the next couple of weeks. - 4-14-03

As you can see, the work is almost done.  Just a few plants, some work on the yard, and the outside is complete. The inspector is due sometime this week.  

04-26-1.jpg (36704 bytes)  04-26-2.jpg (38540 bytes)  04-26-3.jpg (30764 bytes)  04-26-4.jpg (33189 bytes)

We've added two stain glass windows on the front, they are shown below.  The sanctuary also looks a little barren.  The refinished pews should be done in the next week or so. - 4-26-03

 04-26-5.jpg (95487 bytes)  04-26-6.jpg (102619 bytes)  04-26-7.jpg (24703 bytes)  04-26-8.jpg (27518 bytes)


We are also in the process of  making a "Memorial Garden". - 1-1-05

Garden-1.JPG (56745 bytes)  Garden-2.JPG (51981 bytes)

The Garden, Picnic Shelter, and Playground

P6210136.JPG (565000 bytes) P6210128.JPG (551769 bytes)